Arlington Central School Senior Center / HHS Renovation Progress Photo-documentation 1-19-21 PTBC Meeting VERTEX 1 New switchgear panel 2 New switchgear panel 3 Panoramic view of switchgear panels, electric panels and boilers. 4 Floor deck removal for access to Ground Floor crawlspace. 5 Floor deck removal for access to Ground Floor crawlspace. 6 Floor deck removal for access to Ground Floor crawlspace. 7 Floor deck removal for access to Ground Floor crawlspace. 8 Floor deck removal for access to Ground Floor crawlspace. 9 Reuse of existing door and frame in new framed wall of 1st floor. New framing required vertical shim due to throat width of door frame. 10